The factory of oil products in Klaipėda
The works carried out in 2008-2009 year.
Prepared and approved a detailed plan.
There were carried out outside reconstruction works of engineering systems in the operating factory.
There were arranged the welfare of factory’s territory.
There was built storage for metal containers in the operating factory’s territory.